Heating Plant Boiler #3 Replacement
Existing High Temperature Hot Water (HTHW) Boiler #3 has reached the end of its useful life, and has no pollution controls capabilities. Project will remove the existing boiler and replace it with a new Low Emissions HTHW Boiler located in a new addition onto the north end of the Heat Plant.
Budget = $5,000,000
Construction Schedule – Summer 2022 to Summer 2023